Current Projects

The widening of FM 664 is a scheduled project through Texas Department of Transportation (TXDOT). The project is from I-35 East at FM 664 to Westmoreland Road and is approximately 3.131 miles.

FM 664 Project

TXDOT Moves Forward With First Loop 9 Section (I-35E to I-45)

Loop 9 has been identified in transportation planning efforts for a number of years, but changes in demographics; traffic growth and forecasts; and the potential to connect to other major facilities have driven the need to re-evaluate the overall concept of the facility. Between 2006 and 2011, TXDOT developed schematic plans and evaluated potential natural, cultural, and socio-economic impacts for the Loop 9 Southeast project. The proposed project was evaluated as a 6-lane new location controlled access tollway with intermittent access roads between US 287 and I-20 within a 450- to 600-foot corridor depending on interchange location.  

Loop 9

Image result for transportation pictures




Glenn Heights Action Center
Mobile App

Are you on the go and need to report an issue to the City of Glenn Heights? Download Glenn Heights Action Center App today! You can report potholes, animal control situations, traffic concerns, criminal gang activity, and much more with just a few clicks. You can even snap a picture to include with your request. Download the app by going to App Store for iOS devices and Google Play for Android devices.

 

            

Remember: Always dial 911 for Police, Fire, and Emergency Medical Services.